CLIENT PARTICULARS OF CONSTRUCTION Salient Feature of work Area In Sq.Ft Rate Per Sq.Ft (In Indian Rupees) Year completed Completed Cost (In millions of indian Rupees) Works completed
Public Works Dept, District Pune Sluice Tower, Panshet (Emergency Work completed in 6 weeks only.) - - - 1961 0.2Works completed
Public Works Dept, Bombay Police Quarters at Naigaon, Bombay 8 Buildings -1,40,000 20.00 1963 2.80Works completed
Public Works Dept, District Pune Mutha Right Bank Canal, Mile Nos. 9 to 12, at Pune -- - 1965 6.50Works completed
Bel Haven Public Works Dept, Bombay 1 Building for Class 1 Govt. Officers -52,181 22.00 1967 1.10Works completed
Public Works Dept, Bombay Extension to Government Printing Press, Chami Road, 1 Building - 1,00,000 20.31 1968 2.00Works completed
Fertiliser Corpn. of India, Bombay 192 flats at Chembur -50,070 31.00 1969 1.50Works completed
Public Works Dept., Pune Manufacture and supply of RCC slabs -3,53,607 27.00 1969 9.50Works completed
Life Insurance Corpn. of India, Bombay Construction of township consisting of 72 buildings containing 700 Flats -- - 1973 9.00Works completed
The Executive Engineer, Nandgaon Medium Projects Div., Dist : Nasik Raising and strengthening of Chankapur Masonry Dam, Dist.-Nashik.Maharashtra ( India) Raising and strenghtening of Chankapur Masonry Dam - - 1973 95.43 Works completed.
The Executive Engineer,  Ujjani Canal Div. No.1, Bhimanagar,  Dist.- Solapur. Construction of RCC Prestressed Balance Cantilever Round Shaped Aquedect With Service road on top.Near Shevare,Tal.- Madha.Dist : Solapur , Maharashtra ( India) Design & Execution of RCC prestressed balance cantilever round shaped acqueduct with service road on top Length 988 m 4.8 m internal dia. 24 spans of 42m, Max. Pier height 42m - - 1985 26.90 Works completed.
The Executive Engineer,  Ujjani Canal Div. No.11, Solapur, Dist.-Solapur Construction of RCC Prestressed box  Aquedect With Service road on top.Across Nala -Savleshwar, Dist : Solapur, Maharashtra ( India) Design & Execution of RCC prestressed box Aqueduct length 645 m and discharge capacity of 13.5 comecs - - 1987 9.05 Works completed.
The Executive Engineer,  Warna Canals Div. No.II, Sangli. Construction of RCC Prestressed box  Aquedect With Service road on top.Across Nala -Meni, Dist.-Sangli, Maharashtra ( India) Design & Execution of Prestressed structure of twin box type with total length 400 m, and discharge capacityof 60cumec  - - 1991 17.22 Works completed.
The Executive Engineer,  Khadakwasla Head Works Div., Sinchan Bhavan, PUNE-411011. Construction of Veer Baji Pasalkar Dam across river Mose (Masonry Gravity Dam) Dist : Pune, Maharashtra ( India) Masonry gravity type of dam across river Mose length 800m, Height - 70m - - 1991 178.34 Works completed.
The Executive Engineer,  Khadakwasla Head Works Div., Sinchan Bhavan, PUNE-411011. Construction of Power house at the Foot of Veer Baji Pasalkar Dam , Warasgaon, Dist Pune. Maharashtra ( India) RCC Frame Structure 8 Mega watts capacity. - - 1991 9.38 Works completed.
The Executive Engineer,  Khadakwasla Head Works Div., Sinchan Bhavan, PUNE-411011. Construction of Power house at the Foot of Tanajisagar Dam , Panshet, Dist Pune, Maharashtra ( India) RCC Frame Structure 8 Mega watts capacity. - - 1991 11.60 Works completed.
The Executive Engineer, Warna Canals Div. No.1, Islampur, Dist.- Sangli Construction of RCC Prestressed box  Aquedect With Service road on top.Across River Warna Dist.-Sangli, Maharashtra ( India) Design & Execution of Prestressed structure of single box type, Length 975 m. Approx, Height 40m  - - 1991 20.97 Works completed.
The Executive Engineer, Ujjani Canal Div. No.VIII, Solapur.Dist.- Solapur. F.R.H.T. Works providing special repairs to Kok Aqueduct , Dist.-Solapur, Maharashtra ( India) Repairs to  Aqueduct by giving support and encasement to four piers.     - - 1993 5.20 Works completed.
The Executive Engineer, Bhima Hydro Electric Div. Bhimanagar, Dist.-Solapur. Construction of power house building and balance work of Pen stock and TRC of Ujani Hydro Electric project at Bhima nagar Dist : solapur,Maharashtra (India) RCC Frame Power House for 10 Megawatts reversible Turbine imported from Japan. - - 1995 23.80 Works completed.
The Executive Engineer, Bhima Hydro Electric Div. Bhimanagar. Dist.-Solapur. Construction of Weir across River Bhima on Downstream of Ujani Dam for Ujani Hydro Electric Project.   Dist , Solapur, Maharashtra ( India) Massonry Weir at the down stream of Ujjani Dam for Ujjani Hydro Electric Power Project. - - 1994 13.00 Works completed.
Executive Engineer,  National Highway Division No. 6 Pune -411001. Construction of PSC Flyover and RCC Viaduct Bridge in Km 29 to 30 on Westerly Divertion NH 4  Construction of PSC Flyover and RCC Viaduct Bridge - - 1994 147.25 Works completed  in extended time.
The Executive Engineer, Public Works Div. No.2, Solapur. Dist.  - Solapur. Construction of high level bridge across river Sina near village Lamboti on NH-9 @ Km. 218/200.  Dist : solapur Maharashtra ( India) RCC Girders - 4 nos.for each span and 9 spans of 25m. each.  - - 1996 33.93 Works completed 2 months ahead of shcedule.
City Enginner  Pune Municipal Corporation ,Pune -411005. Construction of Pre-stressed Concrete Twin Box girder bridge across Mutha river Near  Vitthalwadi Pune  Construction of bridge of 140 Mtr. Consisting of 4 spans of 35 Mtr. Each and constructd in standing water  - - 2000 72.48 Works completed  in extended time.
Executive Engineer,  Takari Pump House Div.-2, Sangli. Construction of prestressed RCC Box Aqueduct across River Yerala on Takari Main Canal @ Ch. 44/060 M Dist.- Sangli, Maharashtra (India) Prestressed superstructure of Twin Box Type with Total Length 172m (4 Spans of 43m each )   - - 2002 66.38 Works completed.
The Executive Engineer (Projects), Pimpri Chinchwad Municipal Corporation, Pimpri-18 Design & Construction of Bridge across river Pavana between Pimprigaon and Rahatani near Mahadev Mandir, Pimpri-17.Maharashtra State, INDIA Design & Execution of River Bridge in Prestressed superstructure of Twin Box Type with Total Length 105m & 12m width. (3 Spans of 35m each )   - - 2004 32.49 Works completed  in extended time.
The Executive Engineer (Projects), Pimpri Chinchwad Municipal Corporation, Pimpri-18 Construction of Grade Separator in front of PCMC Main Building between Backau Wolf Chowk  and Ahilyadevi Holkar Chowk on Mumbai - Pune Road , Pimpri-18. Maharashtra State, INDIA Total Length of Grade Separator = 795m, Width of Grade Separator =16m Vertical Clearence = 4.60m - - 2007 374.40 Works completed  in extended time.
The Additional City Engineer (Projects) Pune Municipal Corporation, Pune-5 Construction and widening of road over bridge on Solapur road near Hadapsar (Central Railway km. 5/10-11 on Pune-Miraj Section), Pune-28. Maharashtra State, INDIA Pune side approach = 140m
Railway portion = 45m
Hadapsar side approach= 180m. Total Length including approaches= 365m
- - 2008 126.82 Works completed  in extended time.
The Executive Engineer (Projects), Pimpri Chinchwad Municipal Corporation, Pimpri-18 Construction of Grade Separator at Khandoba Chowk, Akurdi, on Mumbai-Pune Road, Akurdi, Pune-35. Maharashtra State, INDIA Total Length of Grade Separator = 573m, Width of Grade Separator =21.20m Vertical Clearence = 4.85m - - 2010 475.65 Works completed  in extended time.
The Additional City Engineer (Roads), Pune Municipal Corporation, Pune-411005. Design and Construction of Flyover Over Bridge on Pune-Solapur Road (NH-9) at Magarpatta Hadapsar, Pune-28. Maharashtra State, INDIA Design, Execution of Flyover with precast prestressed "I" Girders & Cast in situ Deck Slabs superstructure for 3 arms and Cast-in-situ slabs for Rotary Portion. Length of 2 lane bridge =463m  Length of 4 lane bridge =295m. - - 2011 161.80 Works completed  in extended time.
The Executive Engineer National Highway Division Solapur, Saat Rasta, Solapur Construction of major bridge accros river Bhima near Hingangaon on Pune Solapur-Road NH-9. Tal Madha Dist Pune. Maharashtra, INDIA Cast-in-situ prestressed "I" Girders & Deck Slabs superstructure for all 14 spans of 30m each. Length of bridge proper = 420m,  Length of Approaches = 880m, Carriageway width = 8.50m Clear & 10.25m overall.     2012 245.96 Works completed  in extended time.
Chief Enginner (Projects) Pune Municipal Corporation ,Pune -411005. Construction of Flyover at Lullanagar Chowk on Kondhawa Road, Pune. Construction of 15 Mtr. Wide and 1575 Sq. Mtr  deck area , Superstructure with PSC I girders, and foundation type is   open foundationof.      2019 298.60 Works completed  in extended time.
Chief Enginner (Projects) Pune Municipal Corporation ,Pune -411005. Repair to old bridge and construction of new bridge at Mundhwa on Mula Mutha river Pune  Construction of 18.5 Mtr. Wide and 280 Mtr Lenth , Superstructure with PSC I girders, and foundation type is   open foundation.      2017 398.65 Works completed  in extended time.
Chief Enginner (Projects) Pune Municipal Corporation ,Pune -411005 Widening of road over bridge no. 191/6,Railway Km 191/19-20 near  Alankar Telkies Pune  Construction of 12 Mtr. Wide and 266 Mtr length with Superstructure of I Shape steel gurders.      2018 192.80 Works completed  in extended time.
JOBS OVERSEAS
Mohamed Assad Aldrees BL Sons, Riyadh, Saudi Arabia
Supervision and labour contract for the construction of a Multi-storeyed Building -1,02,500 40.00 1980 4.10Works completed
MISCELLANEOUS - Works completed
Central Training Institute Sion, Bombay Building for Workshop -65,000 - 1963 -Works completed
Atur Foundation, Pune Nehru Memorial Hall, Pune -29,687 - 1970 -Works completed
Basant Rubber Factory, Bombay Extension to Vikhroli Factory -24,400 - 1971 -Works completed
Reserve Bank of India, Bombay Colaba. 12 - storeyed Building at Bombay-48 Flats -33,582 - 1972 -Works completed
Paraplegic Home, Kirkee, Pune Paraplegic Home, Quarters for Majors, JCs, and CRS, Compound Wall, etc. - 40,000 - 1974 -Works completed
Symbiosis College, Pune Hostel Buildings, Hall and Library -19,729 - 1976 -Works completed
Factory Buildings at Kharadi Water Heaters and Rubber Factories -32,500 - 1982 -Works completed
Factory Buildings at Sanaswadi Water Heaters and Rubber Factories -14,156 - 1984 -Works completed
Extension of Commercial Building art 2-A, Molecli no Road, Pune 5 Floors -34,667 - 1989 -Works completed