Our commitment to community and development is further evident in our widespread civil projects across Maharashtra. Dams and aqueducts, bridges and flyovers and power plants are all projects we have undertaken to improve the quality of life in Pune, elevating it to one of most liveable cities in India.

Completed project

YERAWADA FLYOVER

Completed project

LULA NAGAR

Completed project

MUNDWA

Completed project

ALANKAR

Completed project

BHIMA

Completed project

BHIMA AQUADUCT

Completed project

PASALKAR DAM

All Infrastructure Development Projects

Particulars of Work -Ā Sluice Tower, Panshet (Emergency work completed in 6 weeks only)

Client - Public Works Dept.,Pune

Location - Panshet

Year Completed - 1961

Ā 

Particulars of Work - From Mile No. 9 to 12

Client - Public Works Dept.,Pune

Location - Pune

Year Completed - 1965

Particulars of Work - Raising & strengthening of Chanakpur Dam.

Client - Public Works Dept.,Nashik

Location - Nashik

Year Completed - 1974

Particulars of Work - Construction of RCC Pre-stressed balance cantilever round shaped aqueduct with service road length 988 M, 4.8 M Internal dia, 24 spans of 42 M, Max. Pier height 42 M

Client - The Executive Engineer, Ujjani Canal Div. No. 1 , Bhimanagar

Location - Dist - Solapur

Year Completed - 1985

Particulars of Work - Aqueduct 645 M and dischargeĀ  1316 cusecs. Construction of pre-stressed box Aqueduct with service Road.Ā 

Client - Govt. of Mah. IrrigationĀ  Dept.

Location - Dist - Solapur

Year Completed - 1987

Particulars of Work - Pre-stressed Structure of twin box type, length 480 M & discharge capacity of 60 CusecsĀ 

Client - Govt. of Maharashtra IrrigationĀ  Dept.

Location - Dist. Sangli

Year Completed - 1990

Particulars of Work - Masonry Gravity type Dam across river Mose, Length 80 M, Height 70 M.

Client - Govt. of Maharashtra IrrigationĀ  Dept.

Location - Panshet / Varasgaon, Pune

Year Completed - 1991

Particulars of Work - 125 MĀ  length, Height 40 M. Pre-stressed Box Aqueduct with service road.

Client - Govt. of Maharashtra IrrigationĀ  Dept.

Location - Islampur, Sangli

Year Completed - 1991

Particulars of Work - RCC Frame Structure 8 Mega Watts Capacity.

Client - Govt. of Maharashtra Irrigation Dept.

Location - Panshet / Varasgaon

Year Completed - 1991

Particulars of Work - RCC Frame Structure 8 Mega Watts Capacity.

Client - Govt. of Maharashtra IrrigationĀ  Dept.

Location - Panshet / Varasgaon

Year Completed - 1991

Particulars of Work - Repairs to Aqueduct by giving support and encasement to 4 piers

Client - The Executive Engineer, Ujjani Canal Div. No. VII , Solapur

Location - Solapur

Year Completed - 1993

Particulars of Work - The work of construction of R.C.C. viaduct and P.S.C. fly-over between Km.29 and 30 on Westerly Diversion outside Pune City on Bombay-Pune Road, National Highway No.4, whose total length is 790.05 M

Client - The Executive Engineer, Pune

Location - Pune

Year Completed - 1994

Particulars of Work - Construction of Weir across river for Hydro Electric Project on downstream of Ujani Dam

Client - Govt. of Mah. Public Works Dept.

Location - Ujani, SolapurĀ 

Year Completed - 1994

Particulars of Work - Power House Building and balance work of Pen Stock & TRC of Ujani Hydro Electric Project for 10 Mega Watts Reversible Turbine imported from Japan

Client - Govt. of Maharashtra Irrigation Dept

Location - Ujani, Solapur

Year Completed - 1995

Particulars of Work - Construction of high-level bridge across River Sina near Village Lamboti NH 9 @ Km 218/200, 9 spans of 25 M each

Client - Executive Engineer Works, Div. No. 2, Solapur

Location - Solapur

Year Completed - 1996

Particulars of Work - 140 M Length & 20.10 M wide of Bridge consisting of 4 spans of 35 M each constructed in standing water

Client - Pune Municipal Corporation

Location - Vittalwadi, Pune

Year Completed - 2000

Particulars of Work - Prestressed superstructure of Twin Box Type with Total Length 172m (4 Spans of 43m each)

Client - Executive Engineer, Takari Pump House Div.-2, Sangli

Location - Yerla, Karad

Year Completed - 2000

Particulars of Work - Design and Extension of River Bridge in prestressed Superstructure of Twin Box Type with total length 105 M & (3 spans of 35 m each) & 12 M
Width.

Client - Executive Engineer (P) , Pimpri Chinchwad Municipal Corporation

Location - Pune

Year Completed - 2004

Particulars of Work - Total Length of Grade-Separator =795 M, Width of Grade-Separator=16 M, Vertical Clearance =4.60 M

Client - Pimpri Chinchwad Municipal Corporation

Location - Panshet

Year Completed - 2007

Particulars of Work - Pune side approach =140 M Railway portion = 45 M Hadapsar side approach=180 M. Total Length including approaches=365 M

Client - Pune Municipal Corporation

Location - Hadapsar, PuneĀ 

Year Completed - 2008

Particulars of Work - Total Length of Grade-Separator =573 M Width of Grade-Separator=21.20 M Vertical Clearance =4.85 M

Client - Pimpri Chinchwad Municipal Corporation

Location - Akurdi, Pune

Year Completed - 2010

Particulars of Work - Design, Execution of Flyover with precast prestressed "I" Girders & Castin situ Deck Slab superstructure for 3 arms and Cast-in-situ slabs for Rotary Portion. Length of 2lane bridge=463 M Length of 4lane bridge=295 M.

Client - Pune Municipal Corporation

Location - Magarpatta, Pune

Year Completed - 2011

Particulars of Work - Cast-in-situ prestressed "I" Girders & Deck Slab superstructure for all 14 spans of 30 M each. Length of bridge proper =420 M, Length of Approaches= 880 M, Carriageway width = 8.50 M Clear &10.25 M overall

Client - NationalĀ  Highway Authority

Location - Bhima, Indapur

Year Completed - 2012

Particulars of Work - Construction of 18.5 M Wide and 288 M Length (9 Spans of 32 M length each) in standing water, Superstructure with PSC cast-in-situ ā€œ Iā€ girders, and foundation type is open foundation.

Client - Pune Municipal Corporation

Location - Kharadi, Pune

Year Completed - 2018

Particulars of Work - Construction of 12 M Wide and 266 M length with Superstructure of I Shape steel girders.

Client - Pune Municipal Corporation

Location - Pune Station, Pune

Year Completed - 2018

Particulars of Work - Construction of 15 M Wide and1575 Sq. M deck area, Superstructure with PSC ā€œIā€ girders, and foundation type is open foundation.

Client - Pune Municipal Corporation

Location - Lullanagar,Pune

Year Completed - 2019

Particulars of Work - Design, Execution of the 652 m long four-lane flyover consists of viaduct portion of 280 M length (8 spans of 30 M and 1 span of 40 M) and dual divided carriageways of 7.00.M width each with central median and crash barriers on outer side. The Approach for Bridge is of Reinforced Earth (solid ramps). The Reinforced Earth Portion consists of two divided carriageways of 7.00 M & 377 M length with central median and crash barrier with friction slab at outer side.

Client - Pune Municipal Corporation

Location - Yerwada, Pune

Year Completed - 2023