Property & Infrastructure Developers since 1960
YERAWADA FLYOVER
Design, Execution of the 652 m long four-lane flyover consists of viaduct portion of 280 M length (8 spans of 30 M and 1 span of 40 M) and dual divided carriageways of 7.00.M width each with central median and crash barriers on outer side.
- Golf Club Yerawada, Pune
FLYOVER
Infrastructure Project
Golf Club
Yerawada, Pune
COMPLETED
Project Year - 2023
Infrastructure Project
Golf Club Yerawada Flyover
Design, Execution of the 652 m long four-lane flyover consists of viaduct portion of 280 M length (8 spans of 30 M and 1 span of 40 M) and dual divided carriageways of 7.00.M width each with central median and crash barriers on outer side. The Approach for Bridge is of Reinforced Earth (solid ramps). The Reinforced Earth Portion consists of two divided carriageways of 7.00 M & 377 M length with central median and crash barrier with friction slab at outer side.
Four Lane Flyover
63+
Years of experience. 100+
Total Number of Projects 500+
Total Working Staff